News Flash

Home

Posted on: June 26, 2019

Contractor Set to Begin Road Repairs on Glendenning Parkway Thursday, June 27, 2019

IMG_3263

Advanced Paving will begin repairing the existing road surface by pulverizing, cement modifying and overlaying 3” asphalt on Glendenning Parkway from FM 428 to Preston Road beginning Thursday, June 27, 2019, until July 29, 2019. During phase 1 FM428 to Glen Crossing Drive is anticipated to be closed through approx. Wednesday, July 10, and during Phase 2 Glen Crossing Drive to Preston Road is anticipated to be closed from Wednesday, July 10 to Monday, July 29 with work performed daily between the hours of 8:00 AM and 7 PM, weather permitting.

Drivers are encouraged to follow the posted detour signage, utilize alternate routes, and allow extra travel time during the construction period.

WHAT: Lane Closures

WHERE: Phase 1: FM 428 to Glen Crossing Drive; (full road closure) 6/27 to approx. 7/10

   Phase 2 : Glen Crossing Drive to Preston Road; (full road closure) 7/10 to approx. 7/29

WHEN: Thursday, June 27th, through Monday, July 29th – 8:00 AM to 7 PM Daily, Weather Permitting


Glendenning Pkwy  Preston Rd (Phase 1 - Sheet 1) Glendenning Pkwy  Preston Rd (Road Closure)

Glendenning Pkwy  Preston Rd (Phase 2 - Sheet 1) Glendenning Pkwy  Preston Rd (Road Closure)



Facebook Twitter Email

Other News in Home

Ash st closure

TEMPORARY ROAD CLOSURE:

Posted on: July 15, 2019
DJI_0001

Downtown water tower repainted

Posted on: July 10, 2019
Town Hall GraphicUPDATED_Town Hall Graphic

Town Hall Meeting

Posted on: July 9, 2019
190514_Celina Parks MP Logo

Parks Master Plan Meeting July 18

Posted on: June 11, 2019
FM455 closure

TxDOT to restore FM 455

Posted on: May 8, 2019
modular building

City Hall/Annex Renovations

Posted on: March 7, 2019
Virtual Tour

Celina 360 Downtown Tour

Posted on: July 31, 2018
FishtrapRoadClosure_9112018 (002)

ROAD CLOSURE: Fishtrap Rd

Posted on: September 12, 2018